Water Container Plant
  • Factory Blog
  • Main Product
  • Contact Information
  • Factory Blog
  • Main Product
  • Contact Information

Factory team BLOG

Thank you
for your interest in US

Thank you!

5/13/2022

0 Comments

 
0 Comments

Tagum City, Philippines

5/13/2022

0 Comments

 
0 Comments

Training Session

5/12/2022

0 Comments

 
0 Comments

11th Day - Apr/30 - Opening Day

5/3/2022

0 Comments

 

We woke up at 6:30AM then breakfast. We moved our luggage and suitcase to hotel lobby.

We started going at 8:00AM.

We started opening ceremony at 10:00AM.

We answered some question from local people regarding to our water quality.

We show TDS checking in front of local people and local politician.

We delivery JTB Water Bottle to local people. A lot of "arigato" words were said by local people. They tried to say Japanese language to express their thankful feeling to us.

Many local kids also came along with their parents. They don't know who JTB is now. But I strongly believe, JTB image will be unforgettable. Someday in the future, they grow up. When they travel and see JTB logo. Their childhood memory will recall and JTB reputation absolutely steps up to a next level.

I hope all of the members who have been supporting directly and indirectly this Water Container Plant project could see how meaningful it is in person.

Picture
0 Comments

10th Day - Apr/29

5/3/2022

0 Comments

 

We woke up at 6:00AM then breakfast.

We started going at 7:00AM.

Today, painting already dried. We put on new JTB logo which we stored inside our plant for replacement.

We removed the temporary tarpaulin. Everything was beautiful again.

We training for the operation people how to running the machine
- Service counter: press button to start filling water, automatic stop mode or manual stop mode.
- Machine running: turn on-off light, water pumps.
- Scenario: emergency turn off, begin the day steps, closing the day steps.

We went back hotel at 8PM

0 Comments

5th, 6th, 7th, 8th, 9th Day - Apr/24,25,26,27,28

5/3/2022

0 Comments

 

We woke up at 6:30AM and started going at 8:00AM as usual.

Cement already dried. We can start build up our Supply Water Pool System.

We started painting work.

Problem
Electric unstable voltage will reduce machine quality and life
Long raining afternoon and wet weather so that painting will not dry
Borrowed painting machine was broken while working

Solution
Set up Automatic Voltage Regulator 7.5kw
Set up a big waterproof tarpaulin covered whole container plant
Buy new painting machine in market area with 50% lower price
​
Side Work
- Calibrating water height level:

After more than a week experience in many local shops, we learned that people prefers water height level should be almost at the bottle cap level. So, we adjusted our machine to satisfied local people expectation.

We were back to hotel at 8:00PM, 9:00PM.
​

0 Comments

4th Day - Apr/23

5/3/2022

0 Comments

 

We woke up at 6:30AM and had breakfast.

We started going to our plant at 8:00AM.

We checked electric system, light system, solar system. Everything functioned well.

Problem
Then, we saw the supply water which is from Water District has very low water flow.

Our solution is
- Change the standard fountain to bigger one.
- Set up a Supply Water Pool System including 2x2000L outdoor water tank, a water pump with high water flow but less pressure.

Side work
- Air ventilation with a exhaust fan for machine room.

We had lunch in a local food shop nearby our area.

We had dinner at 7:30PM in a local Filipino cuisine restaurant.

0 Comments

3rd Day - Apr/22

5/3/2022

0 Comments

 

We woke up at 6:30AM then had breakfast.

8:00AM, we started going to our container plant by a local tricycle car named Bajaj. From now on, It was our main transportation with a dedicated driver Mr. Leo.

We started setting up Solar Power System.
- Moving out all of Solar system that we stored inside container plant.
- Set up solar aluminum frame on top of container
- Moving up solar panels and lock them to the frame.
- Connect and turn on the solar system

We had one more support hand from local people Uncle Boy. It was done without any difficulty.

7:00PM, we had dinner in our room with Jollibee fast food.




0 Comments

2nd Day - Apr/21

5/3/2022

0 Comments

 

We woke up at 7AM. Breakfast and waiting to go to our site.

We checked inside of our container. Nothing was damaged during shipping. Our calculation for the shipping process is completely accurate.

It was a hard time for the excavator truck to moving our container plant to the decided location. Fortunately, It was done.

Then, we checked inside container again whether something got damaged during excavator truck process. The entrance door and the machine door were difficult to open. We fixed it.

We arrived hotel at 7PM and had dinner which we bought from McDonald's in our room.

0 Comments

1st Day - Apr/20

5/3/2022

0 Comments

 

1st Day Apr/20

We spent almost our time on the airplane and waiting in three airports.

We started to go at 6:00AM in Ho Chi Minh City and arrived in Davao Airport at midnight. We saw Mrs. Rose and her friend still waiting for us in baggage belt area. Thank you so much.

We arrived Big 8 Corporate Hotel in Tagum City around 1:30AM.

0 Comments

1min Production Process Video

5/3/2022

0 Comments

 
0 Comments

That's why we are here.

3/15/2022

0 Comments

 

What we decided today will be our legacy in the future.

Thank you for interest in us.

​With the latest pure drinking water production system applying IoT (the Internet of Things) technology, we will make people's life better through one of the basic needs WATER.
​
Plug and Serve!

0 Comments

March 01st, 2022

3/1/2022

0 Comments

 
Picture
Picture
0 Comments

We are in the final manufacturing process

1/22/2022

0 Comments

 
Picture
0 Comments

Smart Device Simulation Model

12/17/2021

0 Comments

 

After we have been through a lot of operation simulations, we successfully come up with a final simulation model for next installation step.

Picture
Picture
0 Comments
<<Previous
Powered by Create your own unique website with customizable templates.